东热亚洲狂野欧美_五月婷婷性网站免费观看_国产高清在线播放刘婷91_亚洲风情内射推销员_一点都不卡的中文视频_大山深处伦欲小说_国产精品免费观看视频播放_美女裸体啪啪无遮挡免费_对白脏话肉麻粗话AV_最新爆乳中文在线αv网址

Metallurgy of Steel
Metallurgy of Steel

The metallurgical and steel industry usually has a concentrated heat load and high demand. Traditional cooling circulating water systems have room for optimization in terms of water quality maintenance, energy conservation, and consumption reduction operation; As a public auxiliary system,   is not given much attention, leading to scaling of the main equipment, deterioration of thermal performance, ultimately resulting in reduced service life, prominent safety hazards, and high maintenance costs.

Wanxiang has rich experience in the process route, overall implementation plan, and equipment operation monitoring of cooling and circulating water systems in the metallurgical and steel industry. It can provide users with comprehensive solutions and technical consulting services for the entire industry line and lifecycle.

VAN SHARE has long-term and stable cooperation with Baosteel, Wuhu Xinxing Cast Pipe, Pangang, Tongling Nonferrous Metals, Shandong Hengbang, and multiple Inner Mongolia ferroalloy enterprises, providing cooling circulating water system services for blast furnace furnaces, continuous casting furnaces, sintering furnaces, melting furnaces, electric arc furnaces, mineral heat furnaces, crystallizers, air separation towers, etc.


" data-fancybox="fb_142795_1" class="box_hover_shadow box_hover_up"> Wuhu Xinxing Cast Pipe

Wuhu Xinxing Cast Pipe

This project is the technical renovation project of the blast furnace soft water air cooler in the company's iron casting plant, mainly aimed at providing circulating cooling soft water for blast furnace cooling. The company originally used 12 sets of plate evaporative coolers, but due to cooling efficiency issues, the system was partially upgraded and replaced with 6 sets of new closed cooling towers FBN-3564S from our company. The design flow rate of a single cooling tower is 500m3/h, the inlet water temperature is 48 ℃, and the outlet water temperature difference is not less than 8 ℃. The modified system has been in operation since June 2018, and the cooling effect fully meets the design requirements.

  • Pangang GroupFor the capacity expansion project of sponge titanium for high-end titanium and titanium alloys at Pangang, our company provides 6 sets of 38 series CTI certified all steel closed mixed flow cooling towers for its chlorination and refining system engineering submerged arc furnace.
  • " data-fancybox="fb_142794_2" class="box_hover_shadow box_hover_up"> Pangang Group

    Pangang Group

    For the capacity expansion project of sponge titanium for high-end titanium and titanium alloys at Pangang, our company provides 6 sets of 38 series CTI certified all steel closed mixed flow cooling towers for its chlorination and refining system engineering submerged arc furnace.

    Pangang GroupFor the capacity expansion project of sponge titanium for high-end titanium and titanium alloys at Pangang, our company provides 6 sets of 38 series CTI certified all steel closed mixed flow cooling towers for its chlorination and refining system engineering submerged arc furnace." data-fancybox="fb_142794_2"> $c.title-2
  • TongLing Nonferrous Metals The Tongling Nonferrous Metals Project mainly cools the crystallizers of two sets of horizontal continuous casting units, with high precision requirements for the outlet water temperature. Our company has selected an internal circulation cooling water system for this project, and we provide the overall design and construction of the process system, including design, pipeline construction, and main equipment (chiller unit, circulating water pump). The outlet water temperature has been accurately controlled within 25 ℃± 2 ℃, achieving the design requirements for cooling effect perfectly." data-fancybox="fb_142796_3" class="box_hover_shadow box_hover_up"> TongLing Nonferrous Metals

    TongLing Nonferrous Metals

    The Tongling Nonferrous Metals Project mainly cools the crystallizers of two sets of horizontal continuous casting units, with high precision requirements for the outlet water temperature. Our company has selected an internal circulation cooling water system for this project, and we provide the overall design and construction of the process system, including design, pipeline construction, and main equipment (chiller unit, circulating water pump). The outlet water temperature has been accurately controlled within 25 ℃± 2 ℃, achieving the design requirements for cooling effect perfectly.

    TongLing Nonferrous Metals The Tongling Nonferrous Metals Project mainly cools the crystallizers of two sets of horizontal continuous casting units, with high precision requirements for the outlet water temperature. Our company has selected an internal circulation cooling water system for this project, and we provide the overall design and construction of the process system, including design, pipeline construction, and main equipment (chiller unit, circulating water pump). The outlet water temperature has been accurately controlled within 25 ℃± 2 ℃, achieving the design requirements for cooling effect perfectly." data-fancybox="fb_142796_3"> $c.title-2 TongLing Nonferrous Metals The Tongling Nonferrous Metals Project mainly cools the crystallizers of two sets of horizontal continuous casting units, with high precision requirements for the outlet water temperature. Our company has selected an internal circulation cooling water system for this project, and we provide the overall design and construction of the process system, including design, pipeline construction, and main equipment (chiller unit, circulating water pump). The outlet water temperature has been accurately controlled within 25 ℃± 2 ℃, achieving the design requirements for cooling effect perfectly." data-fancybox="fb_142796_3"> $c.title-3
  • Baosteel GroupBaosteel Group's stainless steel production line located in Ningde uses our company's H-type high-temperature differential mixed flow closed cooling tower for cooling the blast furnace chamber. There are a total of 8 sets of mixed flow cooling towers. Due to the reasonable process of the pre cooling device, the mixed flow type is relatively easy to achieve the 8-10 ℃ temperature difference required for blast furnace cooling, and the coils are not prone to scaling." data-fancybox="fb_142797_4" class="box_hover_shadow box_hover_up"> Baosteel Group

    Baosteel Group

    Baosteel Group's stainless steel production line located in Ningde uses our company's H-type high-temperature differential mixed flow closed cooling tower for cooling the blast furnace chamber. There are a total of 8 sets of mixed flow cooling towers. Due to the reasonable process of the pre cooling device, the mixed flow type is relatively easy to achieve the 8-10 ℃ temperature difference required for blast furnace cooling, and the coils are not prone to scaling.

    Baosteel GroupBaosteel Group's stainless steel production line located in Ningde uses our company's H-type high-temperature differential mixed flow closed cooling tower for cooling the blast furnace chamber. There are a total of 8 sets of mixed flow cooling towers. Due to the reasonable process of the pre cooling device, the mixed flow type is relatively easy to achieve the 8-10 ℃ temperature difference required for blast furnace cooling, and the coils are not prone to scaling." data-fancybox="fb_142797_4"> $c.title-2
  • Inner Mongolia JingleiThe construction of a 6 * 4500KVA fully enclosed submerged arc furnace project by Inner Mongolia Jinglei Industrial Co., Ltd. is a third level major construction project. After multiple tests and improvements, our company has successfully applied a mixed flow closed cooling tower to the process circulating water system of the submerged arc furnace for the first time, solving the problems of rapid thermal performance degradation, decreasing temperature difference, scaling and freezing, and wind blown willow catkins in traditional countercurrent closed cooling towers. This scheme has been widely adopted by companies in the same industry and is widely used in the field of mineral heat furnaces." data-fancybox="fb_142799_5" class="box_hover_shadow box_hover_up"> Inner Mongolia Jinglei

    Inner Mongolia Jinglei

    The construction of a 6 * 4500KVA fully enclosed submerged arc furnace project by Inner Mongolia Jinglei Industrial Co., Ltd. is a third level major construction project. After multiple tests and improvements, our company has successfully applied a mixed flow closed cooling tower to the process circulating water system of the submerged arc furnace for the first time, solving the problems of rapid thermal performance degradation, decreasing temperature difference, scaling and freezing, and wind blown willow catkins in traditional countercurrent closed cooling towers. This scheme has been widely adopted by companies in the same industry and is widely used in the field of mineral heat furnaces.

  • Antai TechnologyAntai Technology Co., Ltd. has metallurgical material production lines located in Yongfeng and Zhuozhou production bases. We have purchased over 3000 tons of cooling towers from our company in four batches, totaling more than 20 sets, including 12 200T mixed flow high-efficiency closed cooling towers." data-fancybox="fb_142798_6" class="box_hover_shadow box_hover_up"> Antai Technology

    Antai Technology

    Antai Technology Co., Ltd. has metallurgical material production lines located in Yongfeng and Zhuozhou production bases. We have purchased over 3000 tons of cooling towers from our company in four batches, totaling more than 20 sets, including 12 200T mixed flow high-efficiency closed cooling towers.

    Antai TechnologyAntai Technology Co., Ltd. has metallurgical material production lines located in Yongfeng and Zhuozhou production bases. We have purchased over 3000 tons of cooling towers from our company in four batches, totaling more than 20 sets, including 12 200T mixed flow high-efficiency closed cooling towers." data-fancybox="fb_142798_6"> $c.title-2 Antai TechnologyAntai Technology Co., Ltd. has metallurgical material production lines located in Yongfeng and Zhuozhou production bases. We have purchased over 3000 tons of cooling towers from our company in four batches, totaling more than 20 sets, including 12 200T mixed flow high-efficiency closed cooling towers." data-fancybox="fb_142798_6"> $c.title-3